The New England Clean Energy Connect transmission project is designed to supply up to 1,200 megawatts of Canadian hydropower to the New England power grid.
November 24, 2025
high
infrastructure
Project capacity specification describing the maximum generation the transmission line is intended to carry.
The New England Clean Energy Connect transmission corridor is planned as a 145-mile (233-kilometer) line from Lewiston, Maine, to the Canadian border, including a new 53-mile (85-kilometer) section.
November 24, 2025
high
infrastructure
Geographic and length specifications for the transmission corridor.