Entity: Lewiston, Maine
📊 Facts Database / Entities / Lewiston, Maine

Lewiston, Maine

1 Facts
1 Related Topics
The New England Clean Energy Connect transmission corridor is planned as a 145-mile (233-kilometer) line from Lewiston, Maine, to the Canadian border, including a new 53-mile (85-kilometer) section.
November 24, 2025 high infrastructure
Geographic and length specifications for the transmission corridor.